Description
Features
Specification

Scaffolding runway systems are ideal for suspending hoists to lift and transport loads up to 1600kg easily and safely. Each kit is modular, extendable and can also be supplied with a standard trolley with an eye, trolley with rotating eye or for the largest model- a double trolley with a fixed eye.

Perfect for suspending electric or manual chain hoists on site and getting heavy loads to the top of any scaffolding structure.

Further offline optional extras:

  • Track bends
  • Track junction switches
  • EN795 fall arrest version
  • Festoon cable trolleys and cable to power hoists

A super advantage of the Scaffold Runway System is that you can constantly re-configure the system due to its modular design to achieve a longer or shorter system with the addition or subtraction of additional components which are available from LES. The standard piece length is 1m, but we can offer special lengths upon your request.

  • Clamps to existing scaffolding structure
  • Lift and move loads up to 1,600kg
  • Cantilever over the end of the scaffolding
  • Available in straight and curved sections (please contact our sales office)
  • Change direction with junction switches (please contact our sales office)
  • Suspend a bridge from 2 runways to create a crane system (please contact our sales office)
  • Supplied in kit form for ease of installation, extension and relocation
  • Some components approved to EN795 for fall arrest

 

Model SWL Track Support Centres Point Loading @ Supports* Max. Cantilever
24.000 125kg 1m 163kg 0.35m
25.000 250kg 1.5m 326kg 0.4m
26.000 500kg 1.5m 637kg 0.5m
27.000 1,000kg 1.5m 1294kg 0.5m
27.000 1,600kg 1m 2062kg 0.3m

* This does not include the weight of the hoist and any lifting accessories that may be suspended from the load trolleys.